久久精品国产99久久久蜜臀,亚洲成人性爱二区三区,国内精自视频品线一区2022,国产9区区综合亚洲天堂.com

Welcome to【Xuzhou Sanhuai Heavy Industry Equipment Co., Ltd】Official website!
E-mail:+86 13952132680@163.com  Tel:+86 0516-83101079/83101089 +86 13952132680

Language

News
Through the certification of the authority, it can ensure to provide users with cost-effective products and technical services
Your current location:Home - News - Industry dynamics

News - Industry dynamics

The products are unattended, with small maintenance expansion, stable operation and low spare parts rate

Precautions for installation and debugging of hopper scale

Time:2022-11-18 10:52:31      Click:174

1. Check all parts before installation, and ensure that they conform to the drawings. During transportation, the whole and all parts and instruments have no deformation or damage.

2. The foundation of the hopper scale can not be installed on the platform with vibration source.

3. When the frame is installed, the three sensor seat plates should be leveled in the same horizontal plane.

4, the hopper scale installation must make the force through the axis of the sensor, the upper and lower ends of the support mode to prevent the introduction of additional external force interference.

5, the material door should open and close freely after installation, there is no stuck phenomenon.

6. Relevant control room facilities, cable laying and circuit installation positions shall be operated in accordance with relevant technical requirements.

7, hopper scale limit mechanism bolt and limit block should keep 2mm clearance.

Previous: No!
Next:What are the requirements of the new generation weighing coal feeder?

Return

News you are interested in
Consulting Telephone
+86 0516-83101079 / 83101089 +86 13952132680
13952132680@163.com
Da Peng Zhen Xiao Liu Zhuang, Tongshan District, Xuzhou City, Jiangsu Province